Phase 3 Development

Facilities

Phase 3 Development 2011

This SlideShowPro photo gallery requires the Flash Player plugin and a web browser with JavaScript enabled.

Download Phase 3 Development Brochure

A New Arena for a New Decade

Since opening our doors for the first time in September 2001, The Mardyke Arena UCC has been meeting the sporting, recreational and leisure needs of the students, staff and graduates of UCC, not to mention those of the public at large, for almost 10 years now. All in all it's been an incredible success story, due in large measure to the dedication of our staff and tremendous loyalty of our members. Catering for all ages, from pre-school to the active older person, today, The Arena is widely regarded as one of the country's finest leisure and fitness destinations, with a range of facilities that are second to none.

As part of an on-going process of planned improvements, The Arena completed it's Phase 2 Development in 2006. This saw the expansion of the fitness gym facilities, the provision of a new multi-purpose dance studio and the construction of a purpose built climbing wall hall. Conversely, 2009 brought with it the need for some unplanned development, when following the devastation wrought by the unprecedented flooding of November 19th, a major refurbishment of the entire ground floor of The Arena was required.

Phase 3 Development

Presently, The Arena is undertaking it's most ambitious project to date - the Phase 3 Development which commenced at the end of February 2011. When complete, this €10 million development will represent the very best in modern design and an investment that will translate into a truly world class facility! The development will involve the demolition of the existing external viewing stand along with the existing changing rooms underneath the stand. Circa 3,700 sq metres (40,000 sq feet) will be added to The Arena (over 3 floors) and provide our current and future members, in addition to national and international visitors, with facilities that will rival the very best!

Development Timescale

The main construction work commenced during the last week of February 2011. Work is scheduled to last just 10 months with the completed facility scheduled for hand-over in February 2012. We have already opened brand new changing facilities, gyms, lecture theatre and video-analysis suite. 

Additional Facilities

GROUND FLOOR

Pool side
  • Hydrotherapy reception/waiting room
  • Hydrotherapy changing/showers/toilets
  • Hydrotherapy pool
  • Cold plunge pool
  • New shower area - swimming pool
  • New toilets - swimming pool
  • New group changing rooms - swimming pool
Dry side
  • 2 referee/officials changing rooms
  • 2 home team changing rooms
  • 2 away team changing rooms
Reception Extension
  • New multi purpose dance/fitness class studio

FIRST FLOOR

Pool side
  • New martial arts multi purpose area
  • New exercise physiology laboratory
  • Physiotherapy and wellness centre
Dry side
  • Female locker/changing room
  • Male locker/changing room
  • Mixed sauna and steam relaxation area
  • Hospitality suite
  • New ladies fitness gym

SECOND FLOOR

Pool side
  • 60m 3 lane sprint track
  • 130m 2 lane jogging track
  • Unique cardio vascular exercise stations
  • Fast speed camera and video analysis
Dry side
  • 60 seater team meeting room/lecture theatre
  • Video analysis office
  • 2 new dance/fitness class/multi purpose studios
  • New yoga/pilates studio
  • New administration offices

Mardyke Leisure (UCC) Ltd t/a Mardyke Arena UCC, Mardyke Walk, Western Road, Cork

  • Company Registered No. 344832.
  • Registered Office: Office of Corporate and Legal Affairs, University College Cork, Western Road, Cork.

website design and development by esus